With all the top-soil removed it was time to start levelling the field and determine if additional fill should be brought in. On June 16 the cut into the West bank was started and the material redistributed over the field to level the surface.
Moving material from the cut on the West side to the East side.
Moving the fill.
Excavation on the West side.
Adriano supervising from the middle of the action.
Monty making it all look easy.
Flemming trying to stay out of Adriano's way.
Layritz at the end of the day on June 16.