
|
Trucking in the Roadbase
|
||||||||
|
The brock pad is installed on 8 inches of roadbase. After the subsoil was levelled and compacted we brought in over 200 loads of roadbase.
|
||||||||
![]() |
||||||||
![]() |
||||||||
![]() |
||||||||
![]() |
||||||||
![]() |
||||||||
| Go to Layritz Information Page | ||||||||
|
Last updated
|
||||||||
|
||||||||